EASPM

Buying guide

How to compare strategy, performance and project platforms

A guide you can use with any vendor, us included: the criteria that decide whether a platform holds the link from objective to evidence, one scenario to ask every vendor to show, and the questions for the procurement file.

In short

Compare on one scenario, not on feature lists

Most platforms list the same modules: strategy, KPIs, projects, readiness. What separates them is whether the link between those modules holds. So give every vendor the same scenario from your own entity: one strategic objective, its KPI, a project that serves it, and the evidence for one condition. Ask each to trace it on screen from end to end and back, then compare what you saw, criterion by criterion, rather than what you were told.

Criteria

What to check, and where to see it in EASPM

Criterion What to check with any vendor Where to see it in EASPM
Objective to KPI to project

Each project names the KPI and objective it serves, and a slip shows on the KPI and then on the objective. Ask the vendor to remove a link and see whether the platform notices.

Every item carries its place in the chain, and a broken link is shown. Platform

KPI ownership and cycle

Every KPI has an owner, a formula, a frequency, a data source, a target and a baseline, and entry, review and approval run on dates with alerts.

KPI definitions, targets and baselines, and monitoring cycles. Performance

Evidence and readiness

Framework conditions are records with owners, and evidence is linked to the condition with its date and source. If a tool shows a predicted score, ask how it is calculated and who stands behind it.

A conditions register and an evidence vault, and no predicted score. Frameworks and readiness

Arabic interface

Built right to left or translated: look at tables, charts, timelines, approval chains and reports in Arabic, on real screens rather than slides.

Built in Arabic from the ground up; reports in Arabic and English. Home

Hosting

Where the data and its backups are hosted, and whether each entity has a separate environment. Ask for the answer in writing.

Inside the Kingdom, with a separate environment per entity. Security and hosting

Permissions

Row-level and field-level permissions, single sign-on with your directory, and a way to review what each role sees.

All three, with a record of every change. Security and hosting

Integration

Which of your systems connect, through what, and with which keys and permissions. Ask which integrations are in scope and in the price.

APIs for HR, finance, the entity's directory and other source systems, with dedicated keys and limited permissions. Platform

Security claims

Ask for every certificate with its date and reference. A claim without an issued certificate is a plan, not a fact.

No certification is claimed unless it has been issued. What we do not claim

Implementation

Whether you can start at limited scope with your own data, who configures your methodology, and whether knowledge is transferred to your team.

A pilot environment on one sector or one portfolio, then expansion in stages. How to buy

Support

Published severity levels, response targets, availability, backup and recovery, rather than a promise of good service.

A published service level agreement. Service level agreement

Cost structure

The licence separated from implementation and training, and a clear statement of what support the licence includes. Ask what the subscription is sized by, and what it leaves out.

An annual subscription per entity, sized by scope, with support under the service level agreement; services quoted separately. Pricing and quotes

The demo scenario

One scenario to ask every vendor for

  1. 01

    Your objective

    The same strategic objective from your plan for every vendor, with its owner.

  2. 02

    Its KPI

    The KPI that measures it, with target, baseline, latest reading and measurement cycle.

  3. 03

    A project that serves it

    One project linked to the KPI. Ask the vendor to make it slip, and show where the slip appears.

  4. 04

    The evidence

    One condition from a framework you are measured by, with the evidence that satisfies it, its date and its source.

  5. 05

    And back

    Start from the evidence and trace back to the objective. Then remove a link and see what the platform shows.

Ask for it in Arabic, on screen, on your own data or fictional data of your entity type. In an EASPM demo session this chain is shown on screen with fictional data of your entity type. A worked example of the chain

Procurement

Questions for the procurement file

Ownership
Who owns the product, and who can change the code when a requirement changes?
Hosting
Where are the data and its backups hosted, and is each entity's environment separate?
Certificates
Which certificates has the platform actually been issued, with dates and references?
Cost
What is the subscription sized by, and what do implementation, training and knowledge transfer cost separately?
Service levels
What does the service level agreement commit to: severity levels, response targets, availability, backup and recovery?
Starting scope
Can you start with a pilot at limited scope, and what does expansion look like?
Contracting
Can you buy directly or through a partner, and who provides second-line support either way?
Documents
Which documents will the vendor provide for the internal procurement file?
About this guide

Put EASPM through the same scenario

Tell us in the demo request which objective matters to you; we show the chain on screen with fictional data of your entity type.